Remove requirement for a GPS
This commit is contained in:
parent
b5ea97b5d9
commit
164006f4b0
@ -4,10 +4,6 @@ This is an implementation of a centralized storage network architecture that use
|
||||
|
||||
## Deployment
|
||||
|
||||
A GPS will need to be established and be accurate within range of the entire network to the block.
|
||||
|
||||
Slave nodes must have a modem attached and be within range of the GPS and master.
|
||||
|
||||
The master node must have a modem attached and be within range of all slave nodes.
|
||||
|
||||
1. Deploy at least one slave turtle
|
||||
|
Loading…
x
Reference in New Issue
Block a user